| Wolverine |
 |
Joined: Thu Nov 20, 2008 5:38 pm Posts: 11
|
|
My scenario:
I have 2 cargo ships in a fleet together and when adding an order (e.g. Load 5000kg Food) only the first cargo ship in the fleet loads the resource, forcing me to add a manual loop so that the second cargo ship gets loaded.
e: I do not know if this applies to unloading orders or to troop transports as well.
_________________ 'His glory is absolute, praise be to Khaine, and death, no justice, will befall every one of the weakling Asur in his name.'
|
|